Zones are the places the work happens: Level 2, and inside it East and West. Give each task its zone, then see and filter the schedule by area. Zones are where takt planning starts. They're optional: a project uses them only once someone switches them on.
Switch zones on
- On the Schedule, click Zones: off in the toolbar. You need to be able to edit the schedule.
- Tick Use zones on this project.
- Click + Add a level, or + Add many levels… for a tall building: "Level" from 1 to 20, each with East and West, in one go.
Set them up
- Click a name to rename it. Type an area in square feet if you know it. A level with no area of its own adds up the areas inside it.
- + Inside adds an area inside a level. Zones go two deep: a level and its areas.
- ↑ ↓ move a zone, with the areas inside it.
- Split cuts a zone in two. Its tasks stay in the first half, or you can copy them into the second half too. Copies get the same links: they need what the original needs, and anything waiting on the original waits on the copy as well.
- Merge joins two zones. The tasks move over and the areas add up.
- × deletes a zone. Its tasks move to its level, or to no zone.
- Every change can be undone (Ctrl+Z), and everyone on the schedule sees it straight away.
Give tasks a zone
- Double-click a task and pick its Zone. A task can be in a level as a whole, or in one of its areas.
- Or turn on the Zone column in Customize (List or Gantt) and pick it there.
- A new task takes the zone of the task it's added next to.
See the schedule by zone
- On the Timeline, Board and Calendar, the Zones filter shows one zone or several. Picking a level shows the areas inside it too; (No zone) shows the tasks without one.
- Excel adds a Zone column, such as "Level 2 › East".
- Ask AI knows each task's zone, so you can ask "what's happening on Level 3 next week?"
Takt planning
Once zones are on, the Zones window also offers Use takt planning, which adds a Takt view. See The Takt view.
Zones on floor plans
On the project's Canvas, add a floor plan (a picture or a PDF sheet) and outline each zone on it with + Zone. With takt planning on, the plan colours each zone by the trade working in it. See The project Canvas.
Switch zones off
Untick Use zones on this project in the Zones window. Zones disappear from the task windows, columns, filters and Excel, and the rest of the schedule doesn't change. Nothing is deleted: switch them back on and every zone and every task's zone comes back.